Current Contracting Opportunities

The Metropolitan Washington Airports Authority has issued the following contracting opportunities:

 

Construction Opportunities

IFB-18-32089: Toll Booth Electrical Panel Board Replacement, Dulles Toll Road NEW
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to remove and replace existing electrical panel boards at sixteen toll plaza locations on the Dulles Toll Road, install new conduit and cabling, and supply and install a generator transfer switch and receptacle for those plazas that presently do not have them.
Solicitation Issue Date: January 9, 2019
Due Date for Submissions: February 20, 2019
Amendments Issued: None
LDBE Requirement: 100%
Additional Information

IFB-18-33285: Outbound Make-Up Carousel Replacement, National Airport NEW
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to replace existing make-up baggage carousel MU-05 in the South Pier bag room of Ronald Reagan Washington National Airport Terminal B.
Solicitation Issue Date: January 4, 2019
Due Date for Submissions: February 7, 2019
Amendments Issued: One
LDBE Requirement: 15%
Additional Information

RFP-18-34060: Taxilane B Reconstruction and Widening, Middle Section, Dulles Airport UPDATED
Description: The Contractor shall provide all necessary labor, materials, tools, parts, equipment and supervision to perform the reconstruction and widening of the middle section of Taxilane B at Washington Dulles International Airport. The reconstruction area is approximately 75 feet wide and 1,800 feet long and includes full depth reconstruction with Portland Cement Concrete. Also included is maintenance of air traffic, stormwater pollution prevention, pavement marking, and airfield lighting and signage.
Solicitation Issue Date: December 11, 2018
Due Date for Submissions: January 24, 2019
Amendments Issued: One
DBE Goal: 25%
Additional Information

IFB-18-31790: Main Terminal Baggage Basement Improvements, Dulles Airport UPDATED
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to construct the following improvements to the Main Terminal Baggage Basement at Washington Dulles International Airport: 1. Construction of gypsum board smoke partitions. 2. Construction of a two-hour rated masonry egress corridor. 3. Replacement of and addition of standard room numbering signs. 4. Installation of eight duplex sump pump systems. 5. Miscellaneous guard rail upgrades. 6. Removal of photo eye conduit.
Solicitation Issue Date: November 7, 2018
Due Date for Submissions: January 16, 2019
Amendments Issued: Two
LDBE Requirement: 35%
Additional Information

Design/Build Opportunities

None

Architectural & Engineering Opportunities

None

Services Opportunities

RFP-18-34927: Prescription Drug Benefits Plan NEW
Description: The Contractor shall furnish all labor, materials, equipment and supervision to provide prescription drug benefits for Airports Authority personnel.
Solicitation Issue Date: January 11, 2019
Due Date for Submissions: February 20, 2019
Amendments Issued: None
LDBE Requirement: None
Additional Information

RFP-18-34925: Self-Insured Preferred Provider Option Medical Benefits Plan NEW
Description: The Contractor shall furnish all labor, materials, equipment and supervision to provide self-insured preferred provider option medical benefits for Airports Authority personnel.
Solicitation Issue Date: January 10, 2019
Due Date for Submissions: February 20, 2019
Amendments Issued: None
LDBE Requirement: None
Additional Information

RFP-18-34926: Staff Model Health Maintenance Organization Medical Benefit Plan NEW
Description: The Contractor shall furnish all labor, materials, equipment and supervision to provide staff model health maintenance organization medical benefits for Airports Authority personnel.
Solicitation Issue Date: January 10, 2019
Due Date for Submissions: February 20, 2019
Amendments Issued: None
LDBE Requirement: None
Additional Information

RFP-18-34928: Dental Benefit Plan NEW
Description: The Contractor shall furnish all labor, materials, equipment and supervision to provide dental benefits for Airports Authority personnel.
Solicitation Issue Date: January 10, 2019
Due Date for Submissions: February 20, 2019
Amendments Issued: None
LDBE Requirement: None
Additional Information

IFB-18-33999: Motor Vehicle Record License Verification Services NEW
Description: The Contractor shall furnish all labor, materials, equipment and supervision to provide Motor Vehicle Record (MVR) license verification and real-time monitoring services to verify that employees hold valid state-issued driver's licenses.
Solicitation Issue Date: January 9, 2019
Due Date for Submissions: February 11, 2019
Amendments Issued: None
LDBE Requirement: None
Additional Information

RFQ-19-10161: Automotive Vehicle Lift Inspection, Maintenance and Repairs, Dulles Airport NEW
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to perform annual maintenance, inspection and repairs of in-ground and above-ground automotive lift equipment in accordance with current ANSI/ALIALOIM Standards for the Equipment Maintenance Division at Washington Dulles International Airport.
Solicitation Issue Date: January 8, 2019
Due Date for Submissions: February 11, 2019
Amendments Issued: None
LDBE Requirement: None
Additional Information

RFQ-18-32838: Fitness Equipment Maintenance, National and Dulles Airports UPDATED
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision for the preventative maintenance of commercial fitness equipment at Public Safety facilities at Ronald Reagan Washington National and Washington Dulles International Airports.
Solicitation Issue Date: January 2, 2019
Due Date for Submissions: January 25, 2019
Amendments Issued: One
LDBE Requirement: None
Additional Information

RFQ-18-33602: E-Mail Marketing Services
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to provide e-mail marketing software that allows drafting, segmenting and sending out bulk e-mail blasts for airport related promotions, launches, services and surveys for marketing and market research purposes.
Solicitation Issue Date: December 27, 2018
Due Date for Submissions: January 15, 2019
Amendments Issued: None
LDBE Requirement: 100%
Additional Information

RFI: Personal Effects Recovery and Management Solution
Description: The purpose of this RFI is to gain information on current industry practices that will meet the Airports Authority requirements for implementation and sustainment of a personal effects recovery and management solution that would be flexible to both Ronald Reagan Washington National and Washoington Dulles International Airports during the recovery from a wide range of incidents. We are seeking qualified expertise and perspective from actual instances where firms were responsible for managing personal effects in the aftermath of a transportation disaster.
Solicitation Issue Date: December 27, 2018
Due Date for Submissions: February 1, 2019
Additional Information

RFP-18-33887: Investment Consultant Services UPDATED
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to provide investment consultant services to support the Airports Authority’s Retirement Committee in carrying out its fiduciary and programmatic responsibilities.
Solicitation Issue Date: December 10, 2018
Due Date for Submissions: January 17, 2019
Amendments Issued: Two
LDBE Requirement: None
Additional Information

RFI: Mobile Ordering App for In-Terminal Concessions, National and Dulles Airports
Description: The Airports Authority hereby invites interested parties to respond to this RFI regarding a Mobile Ordering App for In-Terminal Concessions at both Ronald Reagan Washington National and Washington Dulles International airports. Please note that this App should include both food & beverage and retail locations. The purpose of this RFI is to gather market research for the Airports Authority to offer a Mobile Ordering App for the Concessions Programs at both airports.
Solicitation Issue Date: November 26, 2018
Due Date for Submissions: January 15, 2019
Additional Information

Goods and Equipment Opportunities

None

Concessions Opportunities

None

Dulles Corridor Metrorail Project Opportunities

Project Overview - Dulles Corridor Metrorail Project

Phase One of the Dulles Corridor Metrorail Project constructed the new Metrorail Silver Line from the East Falls Church station on the Orange Line, through Tysons Corner and on to Wiehle Avenue in Reston. Phase Two will continue the line to Dulles International Airport and into Loudoun County.

Dulles Corridor Metrorail Project - Phase Two

Capital Rail Constructors, a joint venture of Clark Construction Group and Kiewit Infrastructure South, is the Metropolitan Washington Airports Authority's design-build contractor for Phase Two of the Dulles Corridor Metrorail Project, which will build 11.4 miles of track and six stations in Fairfax and Loudoun counties. Construction of Phase Two began in 2013 and will continue through 2018.

The following link will take you to the Capital Rail Constructors website where you can learn about subcontracting opportunities for Phase Two of the Dulles Corridor Metrorail Project:

Capital Rail Constructors Subcontracting Information

Additional Dulles Corridor Metrorail Project Contracting Opportunities

The Metropolitan Washington Airports Authority has issued the following additional contracting opportunities for the Dulles Corridor Metrorail Project:

None

Land Development Opportunities

None